Reference map

Filter by Category:

Biogas facility Lubikow

Lubikow/Poland

System output: 499 kW

Planning
Heating- and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Control- and electrical engineering
Activated carbon filter

3D-Planung-Anlage-Ausschnitt-200x200

Biogas facility Bor

Bor/Turkey

System output: 5.300 kW

Heating- and substrate technology
Process equipment
Biogas technology
Control- and electrical engineering

default

Biogas facility Turgutlu

Turgutlu/Turkey

System output: 3.002 kW 

Detailed planning
General contractor for whole biogas technology incl. CHP

default

Biogas facility Dunaföldvar

Dunaföldvar/Hungary

System output: 3.600 Nm³/h

Planning
Heating- and substrate technology
Process equipment
Biogas technology
Feeding unit
Gas dryer and activated carbon filter
Biogas compressor 3.600 Nm³/h

3D-Planung-Anlage-Ausschnitt-200x200

Biogas facility Cubuk

Cubuk/Turkey

System output: 3.120 kW 

Planning
Heating technology
Substrate technology
Biogas technology
Control- and elctrotechnology
Visualisation

3D-Planung-Anlage-Ausschnitt-200x200

Biogas facility Akyurt

Akyurt/Turkey

System output: 3.120 kW 

Planning
Heating technology
Substrate technology
Biogas technology
Control- and elctrotechnology
Visualisation

BGA Heiligenkreuz

Biogas facility Heiligenkreuz a. Waasen

Heiligenkreuz a. Waasen/Austria

System output: 841 kW 

General contractor for Heating and gas technology and
Electronic and control technology
1st phase: 511 kWel
2nd phase: 841 kWel
Fermenter
Post fermenter
Final storage

Biogas plant Güney - Turkey

Biogas facility Güney

Güney/Turkey

System output: 3.120 kW

Planning permit
General contractor for all biogas technology

3D-Planung-Anlage-Ausschnitt-200x200

Biogas facility Plandiste 1-20

Vrsac/Serbia

System output: 20×999 kW

Planning for permit

default thumbnail

Biogas facility Srpski Miletic

Sombor/Serbia

System output: 1.189 kW

Planning for permit

default thumbnail

Biogas facility Feketic

Sombor/Serbia

System output: 1.189 kW

Planning for permit

Assembling start in Spreca

Biogas facility Spreča 4

Spreča/Bosnia

System output: 150 kW

Planning for permit
Heating and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Electronic and control technology
Vizualisation

Assembling start in Spreca

Biogas facility Spreča 3

Spreča/Bosnia

System output: 150 kW

Planning for permit
Heating and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Electronic and control technology
Vizualisation

 

Assembling start in Spreca

Biogas facility Spreča 2

Spreča/Bosnia

System output: 150 kW

Planning for permit
Heating and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Electronic and control technology
Vizualisation

IMG_20200817_081239

Biogas facility Sremska Mitrovica

Sremska Mitrovica/Serbia

System output: 999 kW 

Heating and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Electronic and control technology
Vizualisation
Building technology

BGA Gosdorf

Biogas facility Gosdorf

Gosdorf/Austria

System output: 500 kW

Planning for submission and
approval planning
General contractor for gas-,
heating-, substrate-, electrical
engineering and control
technology
Fermenter / 2nd fermenter /
Manure lagoon

default thumbnail

Biogas facility Basaid

Basaid/Serbia

System output: 1064 kW

Plant technology
Substrate- and process technology
Heating technology
Biogas technology
CHP-unit
Control- and electrical engineering

default thumbnail

Biogas facility Melenci

Basaid/Serbia

System output: 1064kW

Plant technology
Substrate- and process technology
Heating technology
Biogas technology
CHP-unit
Control- and electrical engineering

default thumbnail

Biogas facility Cerna

Cerna/Croatia

System output: 999 kW

Planning for submission
Plant technology
Substrate- and process technology
Heating technology
Biogas technology
Control- and electrical engineering

 

default thumbnail

Biogas facility Gunja 2

Gunja/Croatia

System output: 999 kW

Planning permit

Assembling start in Spreca

Biogas facility Spreca 1

Spreča/Bosnia

System output: 150 kW

Heating and gas technology
Substrate technology
Process equipment
Biogas technology
CHP-unit
Electronic and control technology
Vizualisation

3D-Planung-Anlage-Ausschnitt-200x200

Biogas facility Gönen

Gönen/Turkey

System output: 6.000 kW 

Detailed planning
Heating technology
Substrate technology
Biogas technology
Control- and elctrotechnology
Visualisation

DCIM100MEDIADJI_0726.JPG

Biogas facility Slawoborze

Slawoborze/Poland

System output: 999 kW

Heating technology
Substrate control technology and
Process technology
Biogas technology
CHP-unit
Control and electronic technology
Construction technology

BGA Pisarovina

Biogas facility Pisarovina

Pisarovina/Croatia

System output: 1.200 kW

Planning permit
Heating technology
Substrate control technology and
process technology
Biogas technology
Control and electronic technology

3D Planung Anlage-Ausschnitt

Biogas facility Bocar

Bocar /Serbia

System output: 1.067 kW 

Planning permit

FW Netz

Expansion Biomass facility Weitendorf

Weitendorf/Austria

Pre-insulated pipe network

RZ-ÜGST 2

Expansion Biomass facility Allerheiligen b. Wildon

Allerheiligen bei Wildon/Austria

Heating transfer station

Control system

3D Planung Anlage-Ausschnitt

Biogas facility Hajducica

Hajducica/Serbia

System output: 1.000 kW 

Planning permit

Screenshot_20190806-142340_WhatsApp

Biogas facility Lukicevo

Lukicevo/Serbia

System output: 2.130 kW 

Planning permit
Heating and gas technology
Substrate technology
Process equipment
Biogas technology
Electronic and control technology
Vizualisation

default thumbnail

Biogas facility Mali Idos

Mali Idos/Serbia

System output: 999 kW

Planning for permit

3D Planung Anlage-Ausschnitt

Biogas facility Pancevo

Pancevo/Serbia

System output: 999 kW

Planning permit

3D Planung Anlage-Ausschnitt

Biogas facility Zdenci

Zdenci /Croatia

System output: 2.159 kW 

Planning permit

FW Netz

Biomass facility Göttling Lang

Lang bei Lebring/Austria

1 house connection
Pre-insulated pipes
Nahtec_Planungsfoto

Biomass facility Tillmitsch

Tillmitsch/Austria

Planning of district heating and solar array
CTB Zubau IMG_3449

Biomass facility extension CTB Lebring

Lebring/Austria

Planning of heating and sanitary installations
Kesselhaus

Biomass facility Mettersdorf

Mettersdorf/Austria

System output: 300 kW

Boiler house mechanics

Pufferspeicher

District Heating South-Western Styria

/

System output: 1.000 kW 

Buffer storage (50 m3)

Kesselhaus

Biomass facility Großklein

Großklein /Austria

System output: 1.180 kW

Planning
Boiler house mechanics
Buffer storage (35 m³)

Kesselhaus

Biomass facility Allhartsberg

Allhartsberg/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house installations
Kesselhaus

Biomass facility Paternion

Paternion/Austria

System output: 1.000 kW / 1.500 kW

Wind chip boilers
Oil boiler
Boiler room installations

FW Netz

Biomass facility Wenigzell

Wenigzell/Austria

Pre-insulated pipes and accessory
Heating transfer stations

Kesselhaus

Biomass facility Neckenmarkt

Neckenmarkt/Austria

System output: 800 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (12 m³)
Net pump regulation
Remote control system
Boiler house installations

Kesselhaus

Biomass facility Halbenrain

Halbenrain/Austria

System output: 850 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Net pump regulation
Remote control system
Boiler house installations
Electronic installations

Kesselhaus

District heating North Styria

/

Heating transfer stations
Pre-insulated pipes and accessory
Remote control system
Boiler house installations
Control system

FW Netz

Biomass facility Mureck

Mureck/Austria

Pre-insulated pipes and accessory

3D Planung Anlage-Ausschnitt

Biomass facility Schwendgraben

Schwendgraben/Austria

System output: 150 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics
Central control technology
Net regulations
Emergency device
Electronic installations

FW Netz

Biomass facility Preding

Preding/Austria

Renovation of pre-insulated tubing
Kesselhaus

Biomass facility Poysbrunn

Poysbrunn/Austria

Pre-insulated pipes and accessory
Boiler house mechanics
3D Planung Anlage-Ausschnitt

Biogas facility Slatina

Slatina/Croatia

System output: 1.067 kW

Development planning

3D Planung Anlage-Ausschnitt

Biogas facility Trpinja

Trpinja/Croatia

System output: 1.000 kW 

Permit application

BGA Entenfellner

Biogas facility Stössing

Stössing/Austria

System output: 500 kW 

Heating- and gas technology Manure technology
Control- and electrical engineering

Kesselhaus

Biomass facility Laa / Thaya

Laa an der Thaya/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics
Central control technology
Regulation & control
Kesselhaus

Sewage plant Bad Vöslau

Bad Vöslau/Austria

Material supply & logistics
FW Netz

Biomass facility Gössendorf

Gössendorf /Austria

Pre-insulated pipes
Heating transfer stations
Redevelopment of exisiting heating
FW Netz

Biomass facility Grub Strengberg

Strengberg/Austria

Pre-insulated pipes

FW Netz

Biomass facility Bisamberg

Bisamberg /Austria

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Weixelbaum Unterpurkla

Unterpurkla/Austria

Boiler house mechanics
Pufferspeicher

Biomass facility St. Josef

St. Josef/Austria

Buffer storage (30 m³)
Nahtec_Planungsfoto

Biomass facility Diepersdorf

Diepersdorf/Austria

System output: 750 kW

Planning drying facility

FW Netz

Biomass facility Hengsberg

Hengsberg/Austria

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Dietersdorf

Dietersdorf am Gnasbach/Austria

System output: 320 kW

Planning
Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics

FW Netz

Biomass facility Neudorf ob Wildon

Neudorf ob Wildon /Austria

Pre-insulated pipes and accessory

Nahtec_Planungsfoto

Pyrolysis facility Radochen

Großwilfersdorf/Austria

Montage planning
Kesselhaus

Biomass facility Allerheiligen / Wildon

Allerheiligen bei Wildon/Austria

System output: 160 kW

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics

FW Netz

Biomass facility Puch / Weiz

Puch bei Weiz /Austria

System output: 800 kW

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Mellach

Mellach/Austria

System output: 150 kW

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics
Wood chip boiler
Net pump regulation

RZ-ÜGST 2

Biomass facility Wultendorf

Wultendorf/Austria

Heating transfer stations

FW Netz

Biomass facility Eibiswald

Eibiswald/Austria

Pre-insulated pipes and accessory

FW Netz

Biomass facility Deutsch Goritz

Deutsch Goritz/Austria

Pre-insulated pipes and accessory

Pufferspeicher

Biomass facility Wolfsberg

Wolfsberg/Austria

Buffer storage (45 m³)
FW Netz

Biomass facility Gamlitz

Gamlitz/Austria

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Weitersfeld

Weitersfeld /Austria

Pre-insulated pipes and accessory
Heating transfer stations

Boiler house mechanics
Netzwork regulation technology
Remote control system
Kesselhaus

Biomass facility Langau

Langau/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics
Buffer storage (20 m³)
Network pumping control
Remote control system
FW Netz

Biomass facility Gosdorf

Gosdorf/Austria

System output: 500 kW 

Pre-insulated pipes and accessory
Heating transfer stations

Boiler house mechanics
Civil engineering
Kesselhaus

Biomass facility St. Jakob im Walde

St. Jakob im Walde /Austria

Buffer storage (20 m³)
Boiler house mechanics
FW Netz

Biomass facility Semriach

Semriach/Austria

Pre-insulated pipes and accessory

Remote control system
Civil engineering
Kesselhaus

Biomass facility Piringsdorf

Piringsdorf/Austria

System output: 800 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Net pumping regulation
Remote control system
Boiler house mechanics

Kesselhaus

Biomass facility St. Georgen / Leys

St. Georgen an der Leys /Austria

System output: 300 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Net pumping regulation
Boiler house mechanics

FW Netz

Biomass facility Opponitz

Opponitz/Austria

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Nestelbach

Nestelbach bei Graz /Austria

System output: 300 kW

Wood chip boiler
Buffer storage (10 m³)
Pre-insulated pipes and accessory
Heating transfer stations
Net pumping regulation
Remote control system
Boiler house mechanics

FW Netz

Biomass facility Großwilfersdorf

Großwilfersdorf/Austria

Pre-insulated pipes and accessory

FW Netz

Biomass facility Margarethen / Moos

Margarethen am Moos /Austria

Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Oberrabnitz

Oberrabnitz/Austria

System output: 400 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Net pumping regulation
Remote control system
Boiler house mechanics

Kesselhaus

Biomass facility Emmersdorf

Klagenfurt-Emmersdorf/Austria

System output: 1.500 kW

Wood chip boiler
Boiler house mechanics

Kesselhaus

Biomass facility St. Marein

St. Marein bei Graz /Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Control & regulation

 

Kesselhaus

Biomass facility Haidershofen

Haidershofen/Austria

System output: 800 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage
Remote control system
Boiler house mechanics

Kesselhaus

Biomass facility Edlitz

Edlitz/Austria

System output: 300 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Remote control system
Boiler house mechanics

Kesselhaus

Biomass facility Körmend

Körmend/Hungary

System output: 5.000 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Remote control system
Boiler house mechanics
Electronic installations

FW Netz

Biomass facility Stipits Rechnitz

Rechnitz/Austria

Pre-insulated pipes and accessory

3D Planung Anlage-Ausschnitt

Biomass facility Szombathely

Szombathely /Hungary

System output: 7500 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics

Kesselhaus

Biomass facility Stallinger Amstetten

Amstetten /Austria

System output: 5.000 kW

Wood chip boiler
Boiler house mechanics

Kesselhaus

Biomass facility Obermarkersdorf

Obermarkersdorf /Austria

System output: 800 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (20 m³)
Remote control system

Kesselhaus

Biomass facility Thalheim Pöls

Pöls /Austria

System output: 800 kW

Wood chip boiler
Pre-insulated pipes and accessory

Kesselhaus

Biomass facility Vestenthal

Haidershofen/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Control & regulation
Kesselhaus

Biomass facility Gloggnitz

Gloggnitz/Austria

System output: 700 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (2 m³)
Remote control system
Boiler house mechanics
Emergency device
Electronic installations
Heat counter
Network regulation & control
Central directive technology

Kesselhaus

Biomass facility Heiligenkreuz / Waasen

Heiligenkreuz am Waasen/Austria

System output: 841 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (35 m³)
Biomass cauldron 800 kW
Oil heating boiler 1.750 kW
Chimney system
Remote control system
Boiler house mechanics
Net pump regulation
Electronic technology installations

 

FW Netz

Biomass facility Pischelsdorf

Pischelsdorf/Austria

Tubing
Civil engineering
FW Netz

Biomass facility Ruprechtshofen

St. Leonhard/Austria

Pre-insulated pipes

Kesselhaus

Biomass facility Sun City Leoben

Trofaiach /Austria

Biomass cauldron 400kW
Gas heating boiler 405 kW
Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Chimney system
Network pump control
Electronic installations
Kesselhaus

Biomass facility Lanzenkirchen

Lanzenkirchen/Austria

Pre-insulated pipes and accessory
Heating transfer stations

Remote control system
Boiler house mechanics
Electronic installations
Hydraulic cover
Kesselhaus

Biomass facility Grimmenstein

Grimmenstein /Austria

Pre-insulated pipes and accessory
Heating transfer stations
Gas boiler cauldron 225 kW
Network pump control
Remote control system
Boiler house mechanics
Electronic installations
Hydraulic cover
Kesselhaus

Biomass facility Weitendorf

Weitendorf /Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Electronic installations
Network pump control
Kesselhaus

Biomass facility St. Peter / Ottersbach

St. Peter am Ottersbach /Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Electronic installation
Network pump control
Kesselhaus

Biomass facility Bad Mitterndorf

Bad Mitterndorf/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Boiler house mechanics
Kesselhaus

Biomass facility Bad Kleinkirchheim

Bad Kleinkirchheim/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Network pump regulation
Kesselhaus

Biomass facility Bromberg

Bromberg/Austria

System output: 400 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Electronic installation
Hydraulic cover

Kesselhaus

Biomass facility Kainbach

Kainbach bei Graz /Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Electronic installation
Kesselhaus

Biomass facility Oberloisdorf

Oberloisdorf/Austria

System output: 850 kW

Wood chip boiler
Pre-insulated pipes and accessory
Heating transfer stations
Buffer storage (20 m³)
Remote control system
Boiler house mechanics
Electronic installation
Network pump control

FW Netz

Biomass facility Lang in Lebring

Lang /Austria

Pre-insulated pipes and accessory
Heating transfer stations

Kesselhaus

Biomass facility St. Oswald

St. Oswald/Austria

Pre-insulated pipes and accessory
Heating transfer stations
Remote control system
Boiler house mechanics
Network pump control
AHI

Biogasanlage Suluova

Suluova/Türkei

Leistung: 6.637 kW

Einreichplanung,
Generalunternehmer für gesamte Biogastechnik inkl. BHKW

Balatonszabadi

Biogas facility Balatonszabadi

Balatonszabadi/Hungary

System output: 1.600 kW

Heating- and gas technology
Manure technology
Machine and engine technology
Control- and electrical engineering

3D Planung Anlage-Ausschnitt

Biogas facility Ovakent

Kayseri/Turkey

System output: 999 kW

Planning permit
Detailed planning

Virje

Biogas facility Virje

Virje /Croatia

System output: 1.189 kW

Heating and gas technology
Manure technology
Machine & engine technology
Electronic & control technology
CHP-unit
Transfer stations

3D Planung Anlage-Ausschnitt

Biogas facility SVZ Tomaszow

Tomaszów Lubelski/Poland

System output: 835 kW

Planning permit

default thumbnail

Biogas facility San Martín

San Martín /Nicaragua

System output: 800 kW

Control technology

 

Chelmo Grundauftrag PL

Biogas facility Chelmo

Chelmo/Poland

System output: 637 kW 

Heating and gas technology
Manure technology
Machine & engineering technology
Electronic & control Technology
CHP-unit

2. stage – Expansion up to 1.274 kWel

3. stage Expansion post fermenter 4

3D Planung Anlage-Ausschnitt

Biogas facility Oradea

Oradea /Romania

System output: 3.000 kW

Planning permit

Kalnik HR

Biogas facility Kalnik 1 Gregurovec

Gregurovec /Croatia

System output: 2.380 kW 

Heating and gas technology
Manure technology
Machine and engine technology
Electronic and control technology

PIK Vinkovci

Biogas facility Pik Vinkovci

Vinkovci /Croatia

System output: 2.380 kW

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Gunja - fermenter heating finished

Biogas facility Gunja

Gunja /Croatia

System output: 1.067 kW

Planning permit
Heating and gas technology
Manure technology
Machine technology
Electronic and control technology
Visualisation

Osilovac HR

Biogas facility Osilovac Fericanci

Fericanci /Croatia

System output: 1.000 kW 

Planning for permit
Heating and gas technology
Manure technology
Machine technology
Control- and electrical engineering
Dosing system

Surany

Biogas facility Surany Lipová

Lipová /Slovakia

System output: 2 x 500 kW

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology
CHP-unit

Vajszlo

Biogas facility Vajszló

Vajszló/Hungary

System output: 637 kW

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Ovcara

Biogas facility Ovcara

Ovcara /Croatia

System output: 2.380 kW

Heating- und gas technology,
manure technology, machine technique,
Electrical- and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Rastina

Višnjevac/Croatia

System output: 500 kW

Planning permit

0-02-0a-627cd8dfed011ae8a68e9e832a4e5efe7d9fa2ef805b1ac6218306dc72895090_65b100de

Biogas facility Hrastovac

Hrastovac/Croatia

System output: 500 kW
Planning permit
Final storage tank technology
Substrate and processing technology
Control and electro technology

 

Popovac

Biogas facility Popovac

Popovac/Croatia

System output: 2.380 kW

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Durdjevac

Đurđevac/Croatia

System output: 1.ooo kW

Planning permit

3D Planung Anlage-Ausschnitt

Biogas facility SG Weller Gornja Kovacica

Gornja Kovacica/Croatia

System output: 1.000 kW

Planning  permit

 

Maria Lankowitz

Biogas facility Maria Lankowitz

Maria Lankowitz/Austria

System output: 35 kW 

Heating and gas technology
Manure technology
Stirring and pump technology

BGA Mitrovac_HR

Biogas facility Mitrovac

Mitrovac/Croatia

System output: 2.000 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Maribor

Maribor /Slovenia

System output: 999 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology
Vaporizer and hygenisation

3D Planung Anlage-Ausschnitt

Biogas facility Werbkowiece

Werbkowiece/Poland

System output: 1.000 kW 

‘Planning permit

3D Planung Anlage-Ausschnitt

Biogas facility Rejowiec

Rejowiec/Poland

System output: 1.000 kW 

Planning permit

3D Planung Anlage-Ausschnitt

Biogas facility Marl Creek Walkerton

Walkerton/Canada

System output: 750 kW 

Control technology

Teplice Slowakei

Biogas facility Turcianske Teplice

Turcianske Teplice /Slovakia

System output: 1.000 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Seacliff Leamington

Leamington/Canada

System output: 1.600 kW 

Control technology

Ikreny - Ungarn

Biogas facility Ikreny

Ikreny/Hungary

System output: 500 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Pecin - Tschechien

Biogas facility Pecin Trhové Sviny

Trhové Sviny/Czech Republic

System output: 1000 kW 

General contractor for heating and gas technology,
manure and substrate technology,
machine technology,
electronic and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Sizim Legrad

Legrad/Croatia

System output: 1.000 kW 

Planning permit

3D Planung Anlage-Ausschnitt

Biogas facility Vitacel Ljubljana

Ljubljana/Slovenia

System output: 1.000 kW 

Planning permit

Panawiss - Serbia

Biogas facility Panawiss Padej

Padej/Serbia

System output: 530 kW

Planning permit
Heating and gas technology
Manure technology
Machine technology
Electronic and control technology
Vizualisation
CHP-unit

BGA Demetra

Biogas facility Vicenza

Zermeghedo/Italy

System output: 1.000 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

3D Planung Anlage-Ausschnitt

Biogas facility Petac Medvode

Medvode/Slovenia

System output: 500 kW 

Planning permit

Vesenthini - Italien

Biogas facility Vesentini Verona

San Maria di Zevio/Italy

System output: 500 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Orth an der Donau

Biogas facility Orth a. d. Donau

Orth an der Donau/Austria

System output: 1.000 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Stocking - Österreich

Biogas facility Stocking

Stocking/Austria

System output: 537 kW 

Planning permit & overall planning
General contractor for gas, heating, substrate, electronic and controlling technology
Fermenter and post-fermenter

3D Planung Anlage-Ausschnitt

Biogas facility Bleiburg

Bleiburg/Austria

System output: 100 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

BGA Perbersdorf

Biogas facility Perbersdorf

St. Peter am Ottersbach /Austria

System output: 500 kW 

Planning permit
Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

Kolar - Slowenien

Biogas facility Krizevci

Krizevci pri Ljutomeru/Slovenia

System output: 1.000 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

BGA Drosendorf

Biogas facility Drosendorf

Drosendorf/Austria

System output: 500 kW 

Heating and gas technology
Manure technology
Machine technology
Electronic and control technology

BGA Assinger

Biogas facility Großsulz

Großsulz/Austria

System output: 100 kW 

Heating and gas technology
100 kW biogas facility (electronic)
Fermenter / Post-fermenter / Final storage

3D Planung Anlage-Ausschnitt

Biogas facility Kleber Andelsbuch

Andelsbuch/Austria

System output: 100 kW 

Planning permit
Fermenter / Post fermenter / Final storage

BGA Ploner

Biogas facility Ploner Nikolsdorf

Nikolsdorf/Austria

System output: 100 kW 

Planning permit
Fermenter / Post fermenter / Final storage

Mureck - Anlage 1

Biogas facility Mureck

Mureck/Austria

System output: 1.000 kW 

General contractor for:
Heating- and gas technology
Substrate technology
Control- and electrical engineering
Hydrolysis tank (2)
Fermenters (2)
Post fermentors (2)
Final storage

3D Planung Anlage-Ausschnitt

Biogas facility Prieler Aigen

Aigen im Ennstal/Austria

System output: 250 kW 

Planning permit
1st phase: 100 kWel
2nd phase: 250 kWel
Fermenter / Post fermenter / Final storage

BGA Ratschendorf BHKW

Biogas facility Ratschendorf

Ratschendorf/Austria

System output: 500 kW 

Planning permit
General contractor for:
Heating and gas technology
Manure technology
Machine technology
Electronic and control technology
Fermenters / Post fermenters / Manure pond

3D Planung Anlage-Ausschnitt

Biogas facility Gschweitl Ilztal

Ilztal/Austria

System output: 100 kW 

Redevelopment gas lines
Gas security facilities

3D Planung Anlage-Ausschnitt

Biogas facility Farmer Ligist

Ligist/Austria

System output: 200 kW 

Gas technology

3D Planung Anlage-Ausschnitt

Biogas facility Bernard Hagenbrunn

Hagenbrunn/Austria

System output: 324 kW 

Heating and gas technology
Electronic and control technology
1st phase: 4×324 kWel
2nd phase: 5×324 kWel
Hygenisation (2)
Fermenters (2)
Post-fermenter
Final storage

3D Planung Anlage-Ausschnitt

Biogas facility Atma Gödl Lieboch

Lieboch/Austria

System output: 750 kW 

Heating- and gas technology
Control- and electrical engineering
1st phase: 300 kWel
2nd phase: 750 kWel
Pre-fermenters (3)
Fermenter
Pasteurization facility
Seperator

BGA Weißkirchen

Biogas facility Weißkirchen

Weisskirchen/Austria

System output: 500 kW 

Heating and gas technology
Electronic and control technology
1st phase: 390 kWel
2nd phase 500 kWel
Fermenter / post fermenter / final storage

BGA Edler-Schwarz

Biogas facility Straden

Straden/Austria

System output: 660 kW 

Planning permit
Heating and gas technology
Electronic and control technology
Fermenter heating
1st phase: 143 kWel
2nd phase: 490 kWel
Fermenters (2)
Final storage

BGA Paier

Biogas facility Paier Kirchbach

Kirchbach / Steiermark/Austria

System output: 490 kW 

Planning permit
Heating and gas technology
Electronic and control technology
1st phase: 143 kWel
2nd phase: 490 kWel
Fermenters (2)
Final storage

BGA Kicker

Biogasanlage Kicker Mitterlabill

Mitterlabill/Österreich

Leistung: 660 kW 

Gas-, Heizungs-, Elektro- und Steuerungstechnik

1. Ausbaustufe: 330 kWel
2. Ausbaustufe: 660 kWel
Fermenter / Nachfermenter / Endlager
Kesselhaus

Biomass facility Kirchschlag

Kirchschlag/Austria

Heating transfer stations
Pre-insulated pipe network
Civil engineering
Boiler house installation mechanical (hydraulic integration)